Published 10:42 AEDT · Tuesday, 10 November 2026Pipeline 04:30 AESTVol. I  No. 183
The Grid
Independent Price Reporting for the Compute Market
thegridco.ai
EST. 2026 · SYDNEY
Register · Class-4 record

Financing

Who finances the compute buildout — for the lender, analyst or counterparty underwriting compute as an asset class. A dated record of third-party-reported financing commitments — borrower, lender or guarantor, instrument, amount, status — each quoted verbatim from the stored source and cited to it, while rental-price series with no attributable source circulate elsewhere. The Ledger’s sibling: it records, it does not measure.

Register read at render · 47 rows · newest announced 2026-08-13 · filings register collected 2026-11-10 · joins resolved at request time

Ⅰ · The honesty frame

what this register is · what it is not · what moves a status
The honesty frame

What this is. A record of dated, third-party-reported financing commitments in the compute supply chain — who is financed, by whom or on whose guarantee, through what instrument, for how much, as of when. Every row is quoted verbatim from a stored source (a news item or a commentator’s stated claim), cited to that source’s name and date, and entered the day it was captured. Rows are never edited into a different claim; a correction is a new entry, same discipline as the corrections log.

What this is not. Not a measure, not an assessment, not an index, and not an endorsement of any amount, structure, or counterparty. The Grid does not verify a commitment by recording it: an ANNOUNCED row says a source reported it, an UNVERIFIEDrow says a source described talks, plans, or a claim. Amounts are the source’s figures, not the Grid’s. The totals above the table are register arithmetic — a count and a sum of stated figures — not a reading of the market.

What moves a status. Only a stored regulatory filing (an 8-K or equivalent held in the Grid’s own store) promotes a row from ANNOUNCED to REPORTED; press coverage never does. Status walks forward only. Nothing here has been promoted yet — the store holds no corroborating filing for any row — and the register says so rather than inferring.

Status walk: ANNOUNCED → REPORTED (stored 8-K only) → CLOSED · or WITHDRAWN · UNVERIFIED stays until a source promotes or lapses it
ANNOUNCED27 on recordthe source reports the commitment as made, raised, agreed, or completed — a press report or a specific dated event
REPORTED0 on recordcorroborated by a stored regulatory filing (8-K or equivalent) on record; the only promotion from announced
CLOSED0 on recorda closing or effective date is on the record
WITHDRAWN0 on recordthe source, or a later stored source, records the commitment as withdrawn or lapsed
UNVERIFIED20 on recordthe source describes talks, exploration, plans, or a commentator's structural or forward claim — including undated claims held under the ruled LEVEL-TRIGGERED / STANDING WATCH conventions

Ⅱ · Register arithmetic

count · summed stated amounts by instrument · 47 rows · newest 2026-08-13
Arithmetic on the rows below — not a measure, not an index, no trend. Sums add the sources’ stated figures only; rows without a stated figure are counted, not summed.
All instruments
47
$1082B stated · 26 unstated
Equity-linked
17
$235B stated · 8 unstated
Debt
13
$472B stated · 7 unstated
Guarantee
5
$250B stated · 4 unstated
Lease
5
$60B stated · 3 unstated
Unstated instrument
3
$30B stated · 1 unstated
Vendor financing
3
no stated figure · 3 unstated
Private credit
1
$35B stated

Ⅲ · The register

newest first · 47 on record · quoted verbatim, cited to source
AnnouncedBorrowerLender / guarantorInstrumentAmountStatusSource (stored verbatim)
2026-08-13Vantage Data Centerspublic markets or acquirer (exploring)EQUITY-LINKEDunstatedUNVERIFIEDSTANDING WATCH: scores on filing, sale, or lapse“Sources: Vantage Data Centers, a major hyperscale developer, is exploring options including a sale or an IPO at a valuation of about $100B as soon as next year (Reuters)”— via techmeme · 2026-08-13
2026-08-13AMDinvestment-grade bond buyersDEBT$5BUNVERIFIEDSTANDING WATCH: scores on pricing of the bond sale“Sources: AMD plans to raise as much as $5B in what could be the chipmaker's biggest-ever investment-grade bond sale, as it ramps up spending to meet AI demand (Brian W Smith/Bloomberg)”— via techmeme · 2026-08-13
2026-08-11Compute buyers (10-year horizon)compute markets (via Ornn or similar)DEBTunstatedUNVERIFIEDSTANDING WATCH: 10-year horizon claim“In 10 years, if you take out a loan it's not for your car or house but to buy compute to run more AI—through Orin or similar markets.”— Dave Blundin · moonshots · 2026-08-11extraction confidence: speculative
2026-08-11Hyperscalers (class)node d2_dc_creditunstatedUNSTATED INSTRUMENTunstatedUNVERIFIEDSTANDING WATCH: the objective's corroborating claim (Ornn CEO episode)“The biggest moat for the hyperscalers isn't access to compute and ability to scale compute very well, it's the fact that they can pay for the GPUs very quickly and have the cash flows to do so—the hyperscaler is just a financing system.”— Kush Bavaria · moonshots · 2026-08-11extraction confidence: strong
2026-08-11xAI Terafabpublic markets (IPO proceeds; pension flows)EQUITY-LINKEDunstatedUNVERIFIEDSTANDING WATCH: founder-named row-236 anchor; stated range $16B-$100B“Who's footing the bill for chip fabs and chip design? The public through pension plans funding Elon's $16-100 billion Tera-fab and other fabs, and through taxes subsidizing Intel's fabs.”— Dave Blundin · moonshots · 2026-08-11extraction confidence: strong
2026-08-11OpenAIshare purchasersEQUITY-LINKED$7BANNOUNCED“OpenAI wraps $7B share sale ahead of potential IPO”— via hackernews · 2026-08-11
2026-08-10Lambdanode d2_neocloudleveraged-loan buyers (Bloomberg: sale in progress)DEBT$917MANNOUNCED“Sources: AI cloud computing provider Lambda is selling a $917M leveraged loan to finance the purchase of GPUs as part of a contract with Nvidia (Bloomberg)”— via techmeme · 2026-08-10
2026-08-09SpaceX (10-gigawatt build)node d2_dc_creditNVIDIAVENDOR FINANCINGunstatedUNVERIFIEDSTANDING WATCH: scores on confirmation or lapse“NVIDIA is likely to step in as a financing partner for SpaceX's 10-gigawatt build due to the profitability of the deals.”— Reyk Knuhtsen · semianalysis-weekly · 2026-08-09extraction confidence: moderate
2026-08-09US data-center operators (HUD 8 leases, 704 MW)node d2_dc_creditNVIDIAGUARANTEEunstatedUNVERIFIEDSTANDING WATCH“NVIDIA backstops (HUD 8 leases) total 704 megawatts in the US, with additional direct data center leases and overseas deployments.”— Reyk Knuhtsen · semianalysis-weekly · 2026-08-09cites 2 stored source rowsextraction confidence: strong
2026-08-09NVIDIA GPU buyers (neocloud class)node d2_neocloudNVIDIAVENDOR FINANCINGunstatedUNVERIFIEDSTANDING WATCH: the founder-named enabling-economics claim“GPU costs are recoverable in under one year at $50 million per megawatt per year revenue, enabling vendor financing with NVIDIA.”— Jeremie Eliahou Ontiveros · semianalysis-weekly · 2026-08-09extraction confidence: moderate
2026-08-04American AI stack exportersUS Export-Import Bank / Development Finance CorporationGUARANTEEunstatedANNOUNCED“We launched the American AI Exports Program to create turnkey American AI stack options for the world, backed by government financing organizations like the Export-Import Bank and Development Finance Corporation.”— Michael Kratsios · moonshots · 2026-08-04extraction confidence: strong
2026-07-31Aschenbrenner hedge fund (3.5x levered semis/AI)prime brokersDEBTunstatedANNOUNCED“Leopold Ashen was running a hedge fund with massive leverage on semiconductor and AI stocks; he had about three and a half times leveraged exposure which got him margin called.”— allin · 2026-07-31cites 2 stored source rowsextraction confidence: strong
2026-07-31MediaTekunstatedUNSTATED INSTRUMENT$5BANNOUNCED“MediaTek says its board has approved a discretionary $5B financing budget to support long-term growth, including its expansion into AI chips for data centers (Wen-Yee Lee/Reuters)”— via techmeme · 2026-07-31
2026-07-30GoogleGPU provider (unnamed; 110K GB200/GB300)LEASEunstatedUNVERIFIEDSTANDING WATCH“Google is reportedly paying $900 million a month for 110K GPUs that are a blend of GB200s and GB300s. That's roughly 2x the spot price per hour for those GPUs.”— Dwarkesh Patel · dwarkesh · 2026-07-30extraction confidence: strong
2026-07-30Nexusnode d2_dc_creditbank group (WSJ)DEBT$15BANNOUNCED“Sources: a group of banks is in talks to lend $15B to Nexus to build a Texas data center; Anthropic will lease it and Google has provided financial guarantees (Anissa Gardizy/Wall Street Journal)”— via techmeme · 2026-07-30— via hackernews · 2026-07-30— via hackernews · 2026-08-05
2026-07-29Korean leveraged retail accounts (1.2M)margin lendersDEBTunstatedANNOUNCED“1.2 million leverage trading accounts in South Korea have been hit with margin calls; around 350,000 of them were fully liquidated already (data two weeks old, suggesting closer to 1 million liquidated today).”— Doug O'Laughlin · semianalysis-weekly · 2026-07-29— David Friedberg · allin · 2026-07-31extraction confidence: strong
2026-07-29Hyperscalers (class)node d2_dc_creditglobal bond marketsDEBT$450BUNVERIFIEDSTANDING WATCH“Year-to-date, hyperscalers have raised $450 billion in debt, making them the third-largest debt issuer globally after the U.S. government and China, indicating they are hitting capital supply constraints.”— Doug O'Laughlin · semianalysis-weekly · 2026-07-29cites 2 stored source rowsextraction confidence: strong
2026-07-29ChipAgentsB Capital (led)EQUITY-LINKED$60MANNOUNCED“ChipAgents, which uses AI agents to help speed up the process of chip design, raised a $60M Series A2 led by B Capital, bringing the expanded round to $134M (Max A. Cherney/Reuters)”— via techmeme · 2026-07-29
2026-07-28Texas data centre (operator unnamed)node d2_dc_creditNVIDIA (behind the lease)LEASE$50BANNOUNCED“Nvidia behind $50B lease on Texas data centre that will use its chips”— via hackernews · 2026-07-28
2026-07-27OpenAInode d2_dc_creditNVIDIAGUARANTEE$250BUNVERIFIEDSTANDING WATCH (event-dated): confirmation, restructuring, or lapse of the guarantee“Nvidia in Talks with OpenAI to Guarantee $250B Financing for Data Center”— via hackernews · 2026-07-27— via hackernews · 2026-08-01cites 4 stored source rows↳ also on the Ledger (forward claim, OPEN) · STANDING WATCH (event-dated): scores on confirmation, restructuring, or lapse of the guarantee
2026-07-23APAC data-center operators (class)node d2_dc_creditbackstop guarantorsGUARANTEEunstatedUNVERIFIEDSTANDING WATCH“Backstops (financial guarantees on GPU loans) are important right now for enabling data center build-outs in the Asia-Pacific region.”— semianalysis-weekly · 2026-07-23cites 3 stored source rowsextraction confidence: strong
2026-07-23C-Square (tier-2 data center)public marketsEQUITY-LINKEDunstatedANNOUNCED“C-Square, a tier-2 data center company leveraging AI, IPO'd at $3 billion market cap with $1 billion run rate growing at 16%, showing market expectations for data center growth.”— Jason Lemkin · 20vc · 2026-07-23extraction confidence: strong
2026-07-17AnthropicMeta (computing power)LEASE$10BUNVERIFIEDSTANDING WATCH: scores on deal confirmation or lapse“Meta in Talks to Lease Computing Power to Anthropic in Potential $10B Deal”— via hackernews · 2026-07-17
2026-07-17General Computenode d2_neocloudUpper90 (inference chips as collateral)DEBT$400MANNOUNCED“AI inference startup General Compute gets a $400M loan from tech investment firm Upper90, seemingly the first deal to use inference-specific chips as collateral (Tim Fernholz/TechCrunch)”— via techmeme · 2026-07-17
2026-07-14Switchpublic marketsEQUITY-LINKED$10BUNVERIFIEDSTANDING WATCH: scores on filing or lapse“Sources: data center operator Switch has hired investment banks for a US IPO that could raise up to $10B and value it at $80B, set for as soon as Q4 (Reuters)”— via techmeme · 2026-07-14
2026-07-09NVIDIA (contingent liabilities)node d2_dc_creditunstatedVENDOR FINANCINGunstatedUNVERIFIEDSTANDING WATCH“NVIDIA's contingent liabilities from revenue-recognition-upfront financing deals will look horrible if compute demand slows and there is excess capacity.”— Rory O'Driscoll · 20vc · 2026-07-09extraction confidence: moderate
2026-07-09Vantage (Texas project)node d2_dc_creditDigitalBridgeUNSTATED INSTRUMENT$25BANNOUNCED“Oracle with Stack in New Mexico and Vantage in Texas are gigawatt-scale deals. Financing for the whole project takes place shortly after the lease is signed. Digital Bridge raised $25 billion of financing just maybe a month after the lease was signed for Vantage.”— Jeremie Eliahou Ontiveros · semianalysis-weekly · 2026-07-09extraction confidence: strong
2026-07-07AmazonUS bond marketDEBTunstatedANNOUNCED“Amazon Returns to US Bond Market to Fund AI Infrastructure Build”— via hackernews · 2026-07-07
2026-07-02Valor Atomics (reactor buildout)venture equityEQUITY-LINKEDunstatedANNOUNCED“Valor funded its reactors through venture equity rather than project finance or debt, allowing faster execution than competitors trying to convince risk-averse financiers; once 5 reactors are proven, project finance becomes viable.”— Isaiah Taylor · no-priors · 2026-07-02cites 2 stored source rowsextraction confidence: strong
2026-06-26Hyperscalers (class: Microsoft, Google, Amazon, Meta)node d2_dc_creditdebt and equity marketsDEBTunstatedUNVERIFIEDSTANDING WATCH“The big five companies Microsoft, Google, Amazon, Meta are spending on AI capex faster than they're earning cash flow, meaning it's being financed by debt and equity raises.”— moonshots · 2026-06-26— Peter Diamandis · moonshots · 2026-06-26— Dave Blundin · moonshots · 2026-06-26— Rory O'Driscoll · 20vc · 2026-07-09— Mark Cuban · allin · 2026-07-20extraction confidence: strong
2026-06-25Kalshipublic marketsEQUITY-LINKEDunstatedUNVERIFIEDSTANDING WATCH: scores on filing or lapse“Kalshi is at $2 billion run rate and prepping for IPO, with potential valuation of 10x revenue, having navigated regulatory arbitrage as a prediction market rather than betting.”— 20vc · 2026-06-25extraction confidence: strong
2026-06-23SpaceXbond marketDEBTunstatedANNOUNCED“SpaceX turns to bond market to raise capital, reports $100.8B cash”— via hackernews · 2026-06-23
2026-06-18OpenAIprivate investorsEQUITY-LINKED$122BANNOUNCED“OpenAI just raised $122 billion, bigger than the SpaceX IPO capital raise; they are so tanked up right now they don't need the IPO.”— moonshots · 2026-06-18— Dave Blundin · moonshots · 2026-06-29extraction confidence: strong
2026-06-11Nexusnode d2_dc_creditGoogle (power and lease obligations)GUARANTEEunstatedANNOUNCED“Sources: a group of banks is in talks to lend $15B to Nexus to build a Texas data center; Anthropic will lease it and Google has provided financial guarantees (Anissa Gardizy/Wall Street Journal)”— via techmeme · 2026-06-11— via techmeme · 2026-07-30— via hackernews · 2026-07-30— via hackernews · 2026-08-05
2026-06-11AnthropicNexus (Texas data center)LEASEunstatedANNOUNCED“Sources: a group of banks is in talks to lend $15B to Nexus to build a Texas data center; Anthropic will lease it and Google has provided financial guarantees (Anissa Gardizy/Wall Street Journal)”— via techmeme · 2026-06-11— via techmeme · 2026-07-30
2026-06-02CoreWeave-tied data centernode d2_neocloudhigh-yield bond buyers (5-year, 7.5%)DEBT$900MANNOUNCED“Source: a CoreWeave-tied data center raised $900M via five-year junk bonds, priced at par to yield 7.5%, as the sector increasingly turns to high-yield bonds (Gowri Gurumurthy/Bloomberg)”— via techmeme · 2026-06-02
2026-06-01Anthropicpublic marketsEQUITY-LINKEDunstatedANNOUNCED“Anthropic says it has confidentially filed for an IPO, which could happen as soon as this fall, joining OpenAI and SpaceX in preparing to go public in 2026 (Mike Isaac/New York Times)”— via techmeme · 2026-06-01— via hackernews · 2026-06-01— via hackernews · 2026-08-13
2026-05-28CXMTpublic markets (Shanghai STAR)EQUITY-LINKED$9.8BANNOUNCED“CXMT, which raised $9.8B in a hugely oversubscribed Shanghai IPO, is poised for a debut pop that could lift its market cap several times above its initial ~$85B (Bloomberg)”— via digitimes · 2026-05-28— via techmeme · 2026-07-26— via digitimes · 2026-07-31— via digitimes · 2026-08-01— via digitimes · 2026-08-02
2026-05-23SpaceXpublic marketsEQUITY-LINKED$75BANNOUNCED“SpaceX filed for what's expected to be the largest IPO ever, $75 billion being raised at a valuation probably north of $1.75 trillion.”— Peter Diamandis · moonshots · 2026-05-23— Peter Diamandis · moonshots · 2026-06-18— Brad Gerstner · allin · 2026-07-11extraction confidence: strong
2026-05-20OpenAIpublic marketsEQUITY-LINKEDunstatedANNOUNCED“OpenAI confidentially files for an IPO with the SEC and says it has "not decided on timing yet" (Ashley Capoot/CNBC)”— via techmeme · 2026-05-20— via techmeme · 2026-06-08
2026-05-17DayOne (GDS spinoff)public markets (Singapore/NY)EQUITY-LINKED$5BUNVERIFIEDSTANDING WATCH: scores on filing or lapse“Sources: DayOne, the spinoff of China's largest data center operator GDS Holdings, plans dual IPO in Singapore and NY, seeking to raise $5B at a ~$20B valuation (Owen Walker/Financial Times)”— via techmeme · 2026-05-17
2026-05-14Cerebraspublic markets (Nasdaq)EQUITY-LINKED$5.5BANNOUNCED“Cerebras opens at $350, valuing the chipmaker at $100B+, after raising $5.5B by selling 30M shares at $185, the largest US tech IPO since Uber's debut in 2019 (Jordan Novet/CNBC)”— via techmeme · 2026-05-14
2026-05-08Baidu Kunlunxinpublic markets (Shanghai STAR / Hong Kong)EQUITY-LINKEDunstatedANNOUNCED“Filings: Baidu's AI chip unit Kunlunxin is planning a dual IPO on Shanghai's STAR Board and in Hong Kong; Baidu holds a 58% stake in Kunlunxin (Bloomberg)”— via techmeme · 2026-05-08— via hackernews · 2026-06-29
2026-05-08Broadcomnode d2_dc_creditApollo Global, Blackstone (private credit lenders)PRIVATE CREDIT$35BUNVERIFIEDSTANDING WATCH: scores on deal confirmation or lapse“Sources: Apollo Global and Blackstone are among private credit lenders in talks with Broadcom over a ~$35B financing deal to fund the development of AI chips (Bloomberg)”— via techmeme · 2026-05-08
2026-05-07AnthropicSpaceX (Colossus 1)LEASEunstatedANNOUNCED“Anthropic leases Colossus 1 datacentre from Space X”— via hackernews · 2026-05-07— via hackernews · 2026-05-21— via techmeme · 2026-05-28
2026-02-26GPU cloud SPVs (class)node d2_neocloudprivate lenders (collateral: contracted cash flows)DEBTunstatedUNVERIFIEDSTANDING WATCH“Early debt structures for GPU clusters used SPV structures where the primary collateral was contracted cash flows from investment-grade counterparties like Microsoft and Meta, not the GPUs themselves.”— Neil Tiwari · no-priors · 2026-02-26cites 8 stored source rowsextraction confidence: strong
Undated commitments. A commitment with no stated date is held only as LEVEL-TRIGGERED (a named condition) or STANDING WATCH (a stated review window or event) — the convention is printed in the row so it is auditable, the same rule the Ledger uses.
Citations.Every row names its stored source by name and date; the quote is the stored text as captured (a headline or a commentator’s stated claim), never a paraphrase. Where several stored copies of one story exist, the row cites them all. Internal row ids are not public links.
THE GRID PUBLISHES CONDITIONS AND INPUTS — MARKET OBSERVATION, NEVER INVESTMENT OR PROCUREMENT ADVICE. · COMMITMENTS ARE THIRD-PARTY REPORTS RECORDED FOR THE REGISTER, NOT GRID VIEWS.

Ⅳ · Latest filings

SEC EDGAR filings register · 156 rows held · collected 2026-11-10 · node map 2026-08-22
FiledCompanyFormItemsNode (dated map)Source
2026-11-10CoreWeave, Inc. CRWV8-K2.02 · 9.01d2_neocloud_crwvEDGAR ↗
2026-11-10TAIWAN SEMICONDUCTOR MANUFACTURING CO LTD TSM6-K · FPI—s2_2_foundry_capexEDGAR ↗
2026-11-10TAIWAN SEMICONDUCTOR MANUFACTURING CO LTD TSM6-K · FPI—s2_2_foundry_capexEDGAR ↗
2026-11-05Alphabet Inc. GOOGL8-K8.01 · 9.01d2_hyperscalersEDGAR ↗
2026-11-05Meta Platforms, Inc. META8-K8.01 · 9.01d2_hyperscalersEDGAR ↗
2026-11-04MICROSOFT CORP MSFT8-K8.01 · 9.01d2_hyperscalersEDGAR ↗
2026-11-04ORACLE CORP ORCL8-K8.01 · 9.01d2_hyperscalersEDGAR ↗
2026-11-03ADVANCED MICRO DEVICES INC AMD8-K2.02 · 7.01 · 9.01s1_gpu_acceleratorEDGAR ↗

The 8 most recent of 156 filings held. The register is repo-file storage (no database, by design); a filing enters the events calendar only by founder-run promotion, and a financing status walks forward only on a stored regulatory filing — this module shows the raw regulatory record beside the register, nothing more.

Financing register: third-party reports stored verbatim from the capture row; amounts are the sources’ stated figures in millions of USD unless marked; status promotes only on a stored regulatory filing; totals are register arithmetic, not a measure.